Electric and utility ducting, cable runs and concrete bases for meter, transformer and kit boxes. We trench, lay and back-fill ducting to the utility specs and form up the reinforced bases the equipment sits on.

Cable ducts and draw pits trenched in to DNO and utility spec, with marker tape and the right cover before back-filling.
Service trenches for power, water, comms and gas dug to depth and separated correctly, ready for the utilities to pull through.
Reinforced concrete bases and plinths formed and poured to the DNO drawings for substations, transformers and switchgear.
Smaller concrete bases and pads for meter boxes, kiosks and plant, set level and to the right finished height.
Yes. We trench, bed and back-fill ducting to the depth, separation and cover the DNO or utility require, with marker tape in, so it passes inspection first time.
We do. We form up and pour reinforced bases and plinths to the utility drawings, ready for the kit to be craned on.
Always. We do the trenching, ducting and bases and time it around the electrical and utility teams so the cabling and connections drop straight in.